Suggestions

Chlorine Dioxide System Bello Zon® CDEb

5-200 g/h chlorine dioxide. Max. flow at 0.2 ppm ClO2 metering is 1,000 m3/h

Chlorine dioxide system, which continuously produces ClO2 according to the acid/chlorite method with diluted chemicals. Extremely simple operation, clear construction, analogue control, manual control or via contacts.

Product description

Bello Zon® CDEb is winning over customers, thanks to its ultra-simple operation and clearly laid out construction.

A ready-to-use chlorine dioxide Chlorine dioxide is an exceptionally reactive gas, which is not stored due to its instability ... more in the glossary system for the continuous production and metering of chlorine dioxide Chlorine dioxide is an exceptionally reactive gas, which is not stored due to its instability ... more in the glossary with diluted chemicals. The emphasis is on ultra-simple operation and clearly laid out system design with standard components.

The stroke lengths of the metering pumps are continuously monitored. This rules out inadmissible operating statuses arising from incorrect pump stroke length adjustments.

The system is extremely easy to operate and, alongside a central Start-Stop key, also has colour-differentiated LEDs to display all the operating statuses.

The system can be controlled in an analogue or manual manner or via contacts

Your benefits

  • Minimal training required thanks to extremely simple operation
  • Minimal investment costs
  • Short delivery times
  • Excellent operating safety
  • Simple process integration
  • Location-independent system monitoring in real time via the DULCOnneX platform: Improved process reliability. Reliability and transparency due to real-time monitoring, individual alarms and automated reports.

Field of application

  • Municipal potable water and waste water treatment
  • Industrial process and cooling water
  • Disinfection in the food and beverage industry
    1 2 3 4 5 6

    Technical Details

    Power supply

    • 100-230 V, 50/60 Hz

    Inputs

    • 1 digital input for the Pause function
    • 1 digital input for contact water meter 0.25-20 Hz
    • 1 analogue input 0/4-20mA

    Outputs

    • 1 alarm signal relay
    • 1 warning signal relay

    Operating substances

    • Sodium chlorite 7.5%, purity according to EN 938
    • Hydrochloric acid 9% purity according to EN 939
    • Particle-free water

    Degree of protection

    • IP 54

    Bypass pipework

    • DN 20
    TypeChlorine dioxide capacity*Max. operating pressure **Operating temp.Connector size, chlorite and acid metering pumpsDimensions H x W x DDimensions of the bypass connectorWeight
     min.-max./hourmin./day      
    g/hg/d°CmmDNkg
    CDEb 305–30107 / 8 **15–406x4958 x 700 x 2502023
    CDEb 7510–75207 / 8 **15–406x4958 x 700 x 2502024
    CDEb 20020–200407 / 8 **15–408x5958 x 700 x 2502027
    *The metering figures relate to 5 bar back pressure and an ambient temperature of 20 °C. The minimum capacity/per hour is based on the fact that when the system is operating at below 10 % of the nominal capacity, continuous metering is no longer possible, due to the then low pumping frequency of the metering pumps. Where systems are operating continuously, change the reactor content at least 2 x daily. Do not operate at below the specific minimal output/day.
    **8 bar at maximum 35 °C ambient temperature

    Subject to technical and design changes

    TypeOrder no.
    CDEb 301079438
    CDEb 751079439
    CDEb 2001079440

    Scope of supply:

    Bello Zon® CDEb systems are supplied connection-ready on a wall panel. Connection to the site bypass line is via DN 20 PVC threaded connectors with straight solvent unions. Order suction lances for the chemical pumps, safety collecting pans for the chemical drums and other accessories, like flushing equipment with a vacuum relief valve separately.

    Downloads for Chlorine Dioxide System Bello Zon® CDEb

    More in the Download Centre

    0 Results
    Filter by document type
    Application Example / Reference (0)
    Brochure / Flyer (0)
    Catalogue (0)
    Certificate / Declaration (0)
    Data Sheet (0)
    Drawing / Dimensional Drawing / 3D (0)
    Exploded View / Spare Parts (0)
    Material Safety Data Sheet (0)
    Operating Instructions (0)
    Others (0)
    Press Release (0)
    Publication / Article (0)
    Software (0)
    Wiring Diagram (0)

    Selected filters:

    Matching downloads

    Sort by A to Z
    Load more matches ...
    No more matches available!

    Unfortunately, we did not find an appropriate match.

    All words written correctly?
    Search again with fewer or different search terms?

    Please try again later

    Service Unavailable

    The server is temporarily unable to service your request due to maintenance downtime or capacity problems. Please try again later.

    Overview

    Bello Zon® CDEb is winning over customers, thanks to its ultra-simple operation and clearly laid out construction.

    A ready-to-use chlorine dioxide Chlorine dioxide is an exceptionally reactive gas, which is not stored due to its instability ... more in the glossary system for the continuous production and metering of chlorine dioxide Chlorine dioxide is an exceptionally reactive gas, which is not stored due to its instability ... more in the glossary with diluted chemicals. The emphasis is on ultra-simple operation and clearly laid out system design with standard components.

    The stroke lengths of the metering pumps are continuously monitored. This rules out inadmissible operating statuses arising from incorrect pump stroke length adjustments.

    The system is extremely easy to operate and, alongside a central Start-Stop key, also has colour-differentiated LEDs to display all the operating statuses.

    The system can be controlled in an analogue or manual manner or via contacts

    Your benefits

    • Minimal training required thanks to extremely simple operation
    • Minimal investment costs
    • Short delivery times
    • Excellent operating safety
    • Simple process integration
    • Location-independent system monitoring in real time via the DULCOnneX platform: Improved process reliability. Reliability and transparency due to real-time monitoring, individual alarms and automated reports.

    Application

    Technical Data

    Downloads

    Contact us

    Allen Mak

    Managing Director, ProMinent Fluid Controls PFC far East Pte Ltd.

    »Please send us your request! We will contact you shortly.«

    +65 6747 4935  Send request   

    Matching Products

    1 2

    ProMinent Newsletter - customized to your industry. Register now